1st Day of Work: Job Well Done!

Work Group at end of long day: UMABU, TDS, students, teachers, laborors
Work Group at end of long day: UMABU, TDS, students, teachers, laborors

This is our work group at the end of a long day. We carried concrete in Chinese woks in several concrete “pail” lines to poor the floor in the PC lab and a section in the dorm. We also helped install windows in the PC lab. Too many videos to load, but lots to show when we get back home!

Sorry, comments are closed for this post.